From Your Idea to Your Building Permit

Your vision, our expertise, one seamless process — you'll always know exactly where your project stands and what comes next.

Most people don't realize how many moving parts are involved in getting a residential project permitted in California. Architectural plans are just the beginning — depending on your project, you may also need a structural engineer, solar designer, fire sprinkler engineer, and multiple rounds of plan check corrections before a permit is issued.

We handle all of it. You share your vision — what you want to build — and we take it from there. One point of contact manages every stage: preliminary plans for your review, full construction documents, consultant coordination, permit submittal, and plan check responses through to approval. The architectural phase typically takes 5–10 business days. The biggest factor in total timeline is how quickly you review and approve preliminary plans — most of the schedule is in your hands.

How Your Project Moves From Idea to Permit.

01

Consultation & Project Discovery

Days 1–2

We start by understanding your project — your goals, your site, your timeline, and your budget. We review any existing plans or documentation, discuss the scope of work, and identify the key requirements for your jurisdiction.

Project goals and vision review
Site and lot analysis
Jurisdiction and zoning review
Scope definition and feasibility
Timeline and fee discussion
Engagement agreement

02

Information Gathering & As-Built Documentation

Days 2–4

For projects involving existing structures, we collect all necessary information — site survey, existing plans, photos, and field measurements. Accurate documentation of existing conditions is the foundation of every good plan set.

Site survey and lot documentation review
On-site field measurement (if existing structure)
Existing floor plan documentation
Existing elevation documentation
Site conditions and utility notes
As-built drawing production

03

Preliminary Plans — Your First Review

Days 3–6

Within the first several business days, we deliver preliminary plans for your review — floor plan layouts and exterior elevations. This is your opportunity to request changes, refine the design, and confirm the direction before we finalize. The speed of this phase depends on how quickly you review and respond.

Preliminary floor plan(s)
Preliminary exterior elevations
Design review and client feedback
Design refinement based on your input
Revision rounds as needed
Design sign-off before proceeding

04

Full Construction Documents

Days 5–10 (total architectural phase)

Once the preliminary design is approved, we complete the full construction document set — every sheet required for permit submittal. This is the deliverable that goes to the building department.

Site plan and grading
Floor plans and reflected ceiling plans
Exterior elevations (all sides)
Building sections and wall sections
Roof plan, foundation plan
Electrical plan, general notes and specifications

05

Consultant Coordination (if required)

Runs in parallel after architecture is complete

Many projects require outside consultants — structural engineers, energy consultants, solar designers, fire sprinkler engineers. We coordinate with all required consultants, incorporate their work into the plan set, and manage the process. Consultant timelines run in parallel after the architectural phase is complete.

Structural engineering: 15–20 business days (new construction/ADU) or 10–30 business days total (remodels)
Title 24 energy compliance: included in architectural phase
Solar panel system design: up to 10 business days (new construction/ADU/disaster restoration)
Fire sprinkler system design: up to 10 business days (new construction/ADU/disaster restoration)
Consultant document incorporation into plan set
Final coordination and plan set integration

06

Plan Check Submittal

After all documents are complete

Once the plan set is complete and all consultant documents are incorporated, we prepare and submit the permit application to the building department. We handle the submittal package, fees, and all required documentation.

Submittal package preparation
Building department fee review
Electronic or over-the-counter submittal
Application tracking setup
Submittal confirmation
Plan check timeline monitoring

07

Plan Check Response & Corrections

Varies by jurisdiction

Building departments almost always issue plan check corrections — a list of required changes before they'll approve the plans. We review every comment, prepare the required revisions, and resubmit promptly to keep your project on schedule.

Plan check comment review
Correction strategy and response
Plan revisions and updates
Consultant coordination for corrections
Resubmittal preparation
Resubmittal and tracking

08

Permit Approval

Final milestone

When the building department approves the plans, your permit is issued and your project is ready to build. We deliver the approved plan set, confirm all permit conditions, and ensure you have everything you need to move into construction.

Permit approval confirmation
Approved plan set delivery
Permit conditions review
Construction-ready documentation
Final project handoff
Post-permit support as needed

What You Can Expect From Us

Clear Communication

You'll always know where your project stands. We provide regular updates and are responsive throughout the process.

Professional Drawings

Every plan set is prepared to professional standards — complete, code-compliant, and ready for permit submittal.

Permit-Savvy Coordination

We know the building departments we work with. We navigate the process efficiently and respond to corrections quickly.