After the Fire: What to Do First to Rebuild Your Home

Losing your home to fire is one of the most disorienting experiences a homeowner can face. The first days are a blur of insurance calls, safety assessments, and decisions that feel impossible to make clearly. This guide gives you a concrete sequence — what to do first, what to do second, and how to get from debris to permitted reconstruction plans as efficiently as possible.

The First 48 Hours

Do not enter the structure without clearance. Your local fire department or building department must declare the property safe to enter. Even a partially standing structure can have compromised framing, toxic ash, or unstable walls. Wait for the all-clear.

Document everything before anything is touched. Take photos and video of every room, every wall, every piece of damaged property. Walk the perimeter. Capture the roof, the foundation, the utility connections. This documentation is critical for your insurance claim and for the reconstruction plans that will come later.

Contact your insurance company immediately. Report the loss and ask for your adjuster's name and direct contact. Ask specifically:

  • What is the process for approving reconstruction plans?
  • Do I need to use their preferred contractors, or can I choose my own?
  • What documentation do they need from a drafting or engineering firm?

Secure the property. Board up openings, fence the perimeter if required by your city or county, and post "No Trespassing" signs. Some jurisdictions require this within 72 hours of a fire event.

Week One: Assemble Your Team

You will need three professionals before reconstruction can begin:

1. A licensed drafting or design firm — to prepare the reconstruction plans. These are the architectural drawings that show the building department exactly what you are rebuilding and how. In California, fire reconstruction plans must comply with current building codes, which for homes in high fire hazard severity zones means Chapter 7A requirements for fire-resistant construction materials and assemblies.

2. A structural engineer — if your home had any structural damage, or if the reconstruction involves any changes to the original layout. Many drafting firms, including Liberty Drafting Studios, coordinate structural engineering as part of the plan set.

3. A general contractor — to handle the actual construction once plans are permitted. You can start interviewing contractors while plans are being prepared. Do not sign a construction contract until you have a permitted plan set in hand.

Understanding Chapter 7A

If your home is in a State Responsibility Area (SRA) or a locally designated High Fire Hazard Severity Zone (HFHSZ) — which covers large portions of the Sacramento foothills, Auburn, Grass Valley, El Dorado Hills, and surrounding areas — your reconstruction must comply with California Building Code Chapter 7A.

Chapter 7A governs:

  • Roofing materials — Class A fire-rated roofing required
  • Exterior wall assemblies — ignition-resistant materials
  • Eaves and vents — ember-resistant vent covers, enclosed eaves
  • Decks and porches — ignition-resistant decking materials
  • Glazing — multi-pane windows in certain zones

This is not optional. The building department will check your plans for Chapter 7A compliance before issuing a permit. A drafting firm experienced in fire restoration — not just standard residential construction — will know these requirements and build them into the plans from the start, avoiding costly plan check corrections.

The Reconstruction Plan Set

A complete fire reconstruction plan set typically includes:

  • Site plan — property lines, setbacks, utility locations, access
  • Demolition plan — what remains, what is being removed
  • Floor plans — room layout, dimensions, door and window locations
  • Exterior elevations — all four sides of the building
  • Building sections — wall assemblies, roof construction, floor systems
  • Structural drawings — foundation, framing, connections (if structural engineering is required)
  • Title 24 energy compliance — California's energy code, required on all new construction
  • Chapter 7A details — fire-resistant assemblies, vent details, material specifications

The timeline from first meeting to completed plan set is typically 2–4 weeks depending on the complexity of the home and the availability of existing records.

Working With Your Insurance Company

Insurance companies have their own process for approving reconstruction costs. Here is what to expect:

Scope of loss documentation. Your adjuster will prepare a scope of loss — a line-item estimate of what it costs to rebuild. This is often prepared using software like Xactimate. Review it carefully. If items are missing or undervalued, you have the right to dispute.

Supplemental claims. Code upgrade requirements — including Chapter 7A compliance — are often not included in the initial scope of loss. These are legitimate additional costs that your policy's "code upgrade" or "ordinance and law" coverage should cover. Your drafting firm can provide documentation of the specific code requirements that apply to your property.

Approval of plans. Most insurance companies require approval of the reconstruction plans before releasing funds for construction. Submit your permitted plan set to your adjuster as soon as you receive permit approval.

The Permit Process for Fire Reconstruction

Fire reconstruction permits follow the same basic process as new construction permits, with a few differences:

Expedited review. Many California counties and cities offer expedited plan review for fire reconstruction projects, particularly following declared disasters. Ask your building department about expedited review options.

Pre-application meeting. For complex projects or properties in sensitive zones, a pre-application meeting with the building department can clarify requirements before plans are submitted. This is worth the time — it prevents surprises during plan check.

Plan check timeline. Expect 3–8 weeks for initial plan check, depending on your jurisdiction and current workload. Corrections are common. A drafting firm experienced with your local building department will anticipate common correction items and minimize the back-and-forth.

Common Mistakes to Avoid

Starting demolition before documentation is complete. Once debris is cleared, the evidence of pre-fire conditions is gone. Document thoroughly before any cleanup begins.

Hiring a contractor before plans are permitted. Contractors cannot give you an accurate bid without permitted plans. A bid based on preliminary drawings will change — sometimes significantly — once the full plan set is complete.

Assuming you can rebuild exactly what was there. Current building codes apply to reconstruction. Your new home will need to meet today's energy code, accessibility requirements, and — if in a fire hazard zone — Chapter 7A. Plan for this from the beginning.

Underestimating the timeline. From fire event to move-in, fire reconstruction typically takes 12–24 months. Plans take 2–4 weeks. Permitting takes 1–3 months. Construction takes 6–18 months depending on scope. Set realistic expectations.

How Liberty Drafting Studios Handles Fire Restoration Projects

We have worked on fire restoration projects across the Sacramento foothills — Auburn, Grass Valley, El Dorado Hills, Colfax, and surrounding areas. Our process:

  1. Site visit and documentation review — we review your insurance documentation, existing records, and site conditions
  2. Pre-application coordination — we contact your building department to confirm requirements before drawing begins
  3. Complete plan set preparation — architectural plans, Chapter 7A compliance details, structural coordination
  4. Plan check management — we handle all corrections and resubmittals
  5. Insurance documentation support — we provide the documentation your adjuster needs for code upgrade claims

If your home was damaged or destroyed by fire, contact us. We will walk you through the process, give you a realistic timeline, and get your reconstruction plans moving.

Call David directly: 916-694-9949

Explore Topics

#fire restoration#rebuild after fire#Sacramento#building permits#insurance#Chapter 7A#wildfire reconstruction
D

Written by

David Ardelian, Liberty Drafting Studios

Founder of Liberty Drafting Studios, serving Greater Sacramento with permit-ready architectural plans for ADUs, garage conversions, custom homes, and remodels.

Related Articles